Talybont Gate
This student residence was completed in 2014, and boasts large communal areas with an array of facilities.
In brief
- Completed: September 2014
- Cost: £6.3m
- Architect: Rio Architects
- Contractor: Balfour Beatty
Talybont Gate is a six-storey hall of residence that can accommodate 179 undergraduate and postgraduate students.
Sustainable design
In keeping with the University’s commitment to reducing its carbon footprint, sustainability was a key consideration for the building.
Environmental features include motion sensor lighting and solar panels fitted on the roof to provide power to the building while the students are in residence that feed back into the utility grid at all other times.
We have a range of residences to suit individual preferences and budgets.